Built to pass design review. Solar panel installation in The Woodlands, by our crew from Houston, 27 miles south.
- 27 milesfrom our Houston office, where our crew is based
- 45 daysfor the Township to act on a complete solar application
- TECL 35074Texas electrical contractor license
What happens when The Woodlands’ power goes out?
Grid-tied panels on their own switch off when the grid does, as Entergy Texas requires. Add a home battery and the circuits you pick keep running, recharged by the panels whenever the sun is out. Most of The Woodlands is on Entergy, and Hurricane Beryl cut power to 49% of its customers in July 2024.
- Panels alone
- Off with the grid, and back on when it is.
- Panels and a battery
- The fridge, lights, Wi-Fi, chargers and a few outlets run for about 27 hours on one Powerwall 3, refilled by the panels each sunny day.
The outage record
July 2024Hurricane Beryl
49%
252,460 customers out, 98% restored 8 days after landfall.
February 2021Winter Storm Uri
36%
170,000 customers lost power, nearly all restored 6 days after the freeze began.
August 2017Hurricane Harvey
42%
186,000 customers lost power, restored 17 days after landfall.
Each bar is the share of all Entergy Texas customers, across its Southeast Texas service area, who lost power (for Beryl, at the peak). Figures from Entergy Texas’s own releases, its 2024 resiliency plan filing with the Public Utility Commission of Texas and Entergy’s annual reports, checked November 2026. On CenterPoint? See Houston’s outage record.
How does going solar work in The Woodlands?
About two months from signing. Montgomery County issues no permit for solar on a home’s roof, so the step that decides your design is The Woodlands Township’s review, which has to approve the install in writing before work starts. Then Entergy Texas, which serves most homes here, inspects the system before it credits what you send back. We handle the application, the review and the utility.
- Permit, HOA and utility. About 4 to 6 weeks.
- Installation. Usually 1 to 2 days, by our crew.
- Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.
In The Woodlands
- County permit
- None for rooftop solar on a home in the Montgomery County part, which is all of The Woodlands but Creekside Park. Panels on the ground that need clearing or grading take the county’s development permit. Creekside Park is in Harris County.
- Design review
- The Woodlands Township’s Residential Design Review Committee or its staff must approve it in writing, on the Township’s Civic Access Portal. Fee: $150. It acts on a complete application within 45 days, and the work must finish within 120 days of approval. In Grogan’s Forest’s Cantwell Forest, Avalon Oaks and Dulcimer Woods, which the City of Shenandoah oversees with the Township, you apply at Shenandoah’s city hall instead.
- Panel rules
- A flat profile that follows the roof’s slope, top edge parallel to the ridge, and no part visible above the roofline. Frames, brackets and exposed piping painted to match or suit the roof.
- Trees
- No living tree over 6 inches across, measured 2 feet up, comes down without the Township’s written approval, and topping a tree counts as removing it.
- Utility
- Entergy Texas for most homes, CenterPoint for the rest. On Entergy, a system of 15 kW AC or more needs its approval before installation, and Entergy inspects every system before credits begin.
- Exports
- Entergy credits each kWh you send back at 3.87¢ from May to September and 3.59¢ from October to April (2026). On CenterPoint, your retail plan sets the credit.
Texas’s HOA solar rule
Texas law voids HOA rules that ban or restrict solar panels on your roof, with set exceptions. An HOA can still require its approval first, and can turn down panels that rise above or beyond the roofline, that neither follow the roof’s slope nor keep their top edge parallel to the roofline, or whose frames and brackets aren’t a common silver, bronze or black. It can’t refuse a system that meets those rules unless it finds in writing that where it goes would substantially interfere with others’ enjoyment of their land.
Montgomery County Permit Department (its permit FAQ and its May 2025 letter on building codes); The Woodlands Township’s 2024 Residential Development Standards, permitting page and July 2026 fee order; the Township’s utility pages; Entergy Texas’s net metering page and solar FAQ; Texas Property Code §202.010. Checked November 2026. Your address decides your county and your utility.
What does solar cost in The Woodlands?
Find your monthly kWh on your electricity bill and read across: that’s the system a The Woodlands roof needs to cover 90 to 100% of your use, and its price before incentives. At the Texas average of 1,096 kWh a month, that’s about 8.6 kW, roughly $17,900 to $19,400.
Incentives: Texas has no state solar credit, the 30% federal credit for homeowners ended with 2025, and Entergy Texas offers no solar rebate. What you do get: the value solar adds to your home is exempt from property tax. Apply on Form 50-123 with the Montgomery Central Appraisal District, or in Creekside Park with Harris County’s appraisal district.
Texas incentives in fullBy monthly use
1,096 kWhTexas average
System8.6 kW
Panels20
Before incentives$17,900 to $19,400
1,500 kWh
System11.8 kW
Panels27
Before incentives$24,600 to $26,600
2,000 kWh
System15.7 kW
Panels36
Before incentives$32,800 to $35,400
2,500 kWh
System19.7 kW
Panels45
Before incentives$40,900 to $44,300
Work it out for your own bill
Add up the kWh on your last 12 bills, or multiply one month by 12.
- System in The Woodlands
- 8.6 kW20 panels
- At one IntegrateSun project’s price ($2.08/W)
- $17,900
- At Houston’s average ($2.25/W)
- $19,400
- Before any incentives
- $17,900 to $19,400
Sizing: The Woodlands’s 5.22 peak sun hours a day (PVWatts for Houston, 30 miles south) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s The Woodlands average as of November 2026 (EnergySage has no page for The Woodlands or Montgomery County, so this is its Houston figure). Texas average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.
What does Entergy Texas pay for the solar you send back?
Its avoided cost, well under what you pay: 3.87¢ a kWh from May to September and 3.59¢ from October to April in 2026. You pay Entergy’s regular rates for every kWh you take from the grid, and the two aren’t netted. Homes on Entergy don’t choose a provider, so there’s no better buyback plan to shop for.
We look at your Entergy bill and its rates when we design your system.
Entergy Texas’s solar rules (Entergy Texas’s site, opens in a new tab)On CenterPoint? Part of The Woodlands is, and there you sell your surplus to the retail provider you choose, so your plan sets what it earns. How buyback plans work.
Entergy Texas’s rules for home solar
- Credit per kWh
- 3.87¢ from May to September, 3.59¢ from October to April (2026). Reset each year from Entergy’s February filing with the Public Utility Commission.
- Power you buy
- Every kWh from the grid at Entergy’s regular rates and riders. Its sample bill for 1,000 kWh in November 2026 comes to $168.14 before taxes.
- Carryover
- Credits lower your bill, but not below the minimum bill and the charges solar can’t offset. The rest carries over, and Entergy mails a check once it passes $50.
- Fees
- No monthly charge for a home system of 50 kW or less. A study fee or upgrade costs can apply if the grid needs work.
- Larger systems
- 15 kW AC or more needs Entergy’s approval before installation, and may need a bigger transformer.
How Entergy’s credit changes the design
Panels sized to your daytime use
Each kWh your home uses as it’s made saves Entergy’s full price, while each one sent back earns a few cents, so solar pays most when your home uses it.
Adding a battery
It stores the midday surplus for the evening instead of selling it for a few cents, and keeps your chosen circuits on when the grid is down.
Entergy Texas Schedule SQF (Option 2C), its net metering page and solar FAQ, its 2026 avoided cost filing with the Public Utility Commission of Texas (Project 18692) and its November 2026 sample residential bill. The Township’s utility pages for who serves The Woodlands. Checked November 2026.
What The Woodlands homeowners ask about solar.
Not answered here? Ask us directly.
Call (855) 999-1850Do I need a permit for solar panels in The Woodlands?
Not from the county, for panels on a home’s roof in the Montgomery County part, which is all of The Woodlands except Creekside Park: Montgomery County says homes with solar on the roof need no permit. What you do need is The Woodlands Township’s written approval before work starts, applied for on its Civic Access Portal for a $150 fee. Creekside Park is in Harris County. We handle the application either way.
How an install runs hereDoes The Woodlands Township allow solar panels?
Yes, with its written approval. Its standards ask for panels with a flat profile that follow the roof’s slope, with the top edge parallel to the ridge and no part showing above the roofline, and for frames and brackets painted to suit the roof. It has 45 days to act on a complete application, and one it hasn’t acted on by then counts as disapproved, so it pays to file it complete. Texas law also stops an HOA from banning rooftop solar outright.
Can I cut down trees for solar panels in The Woodlands?
Only with the Township’s written approval. Its standards bar removing any living tree more than 6 inches across, measured 2 feet above the ground, without it, and they count topping or heavy pruning as removal. The reasons they list for allowing removal include a tree within 5 feet of the house, a safety hazard or a diseased or invasive tree; shade on solar panels isn’t one of them. Our site survey checks how much shade your roof gets.
How much does Entergy Texas pay for solar power?
Its avoided cost: 3.87¢ for each kWh you send back from May to September and 3.59¢ from October to April in 2026, reset each year. You pay Entergy’s regular rates for every kWh you take from the grid. Credits that outrun your bill carry over, and Entergy mails a check once they pass $50. It offers no solar rebate.
Entergy’s rules in fullCan I choose my electricity provider in The Woodlands?
Only if your home is on CenterPoint. Most of The Woodlands is on Entergy Texas, where you can’t choose a provider and Entergy credits your solar itself. On CenterPoint you pick a retail provider, and its plan sets what your solar earns, so compare plans before you sign.
How CenterPoint-area plans workHow much do solar panels cost in The Woodlands?
Roughly $17,900 to $19,400 before incentives at the Texas average use of 1,096 kWh a month, which calls for about 8.6 kW of panels. At 2,000 kWh a month, plan on about 15.7 kW: $32,800 to $35,400. Your roof, its shade and your equipment set the real price.
See prices by monthly useWill solar panels keep my power on in an outage in The Woodlands?
Not on their own: Entergy Texas requires grid-tied systems to shut off when its grid goes down. A battery keeps the circuits you pick running: one Powerwall 3 covers the fridge, lights, Wi-Fi, chargers and a few outlets for about 27 hours. Hurricane Beryl cut power to 49% of Entergy Texas’s customers in July 2024.
How long a battery lastsHow far is IntegrateSun from The Woodlands?
About 27 miles in a straight line. Our headquarters is at 7055 Old Katy Rd, Suite 505, Houston, TX 77024, and our installation crew is based in Houston. Call (855) 999-1850 for a free quote.

Ready to make your own power?
Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.
