Certified for the wind, then switched on. Solar panel installation in League City, by the crew from our Houston office, 28 miles away.
- 28 milesfrom our Houston office, where our crew is based
- TNMP or CenterPointthe two utilities whose lines serve League City
- TECL 35074Texas electrical contractor license
What happens to solar when League City loses power?
Without a battery, it stops too: grid-tied panels go quiet in an outage so no power flows back onto lines that crews are repairing. A home battery runs the circuits you choose through the outage and recharges from the panels when the sun is out. On TNMP’s Gulf Coast lines, which serve part of League City, Hurricane Beryl left 81% of customers without power in July 2024, and full restoration took 10 days.
- Panels alone
- Off with the grid, and back on when it is.
- Panels and a battery
- The fridge, lights, Wi-Fi, chargers and a few outlets run for about 27 hours on one Powerwall 3, refilled by the panels each sunny day.
The outage record
July 2024Hurricane Beryl
81%
116,000 customers out, restored 10 days after landfall.
September 2008Hurricane Ike
100%
115,000 customers out, restored 14 days after landfall.
Each bar is the share of TNMP’s Gulf Coast customers (Brazoria, Galveston and Matagorda counties) without power at the peak. Figures from TNMP’s own releases, its parent company’s SEC filings and TNMP’s Beryl filings with the Public Utility Commission of Texas, checked November 2026. Streets on CenterPoint’s lines share Houston’s outage record.
How does going solar work in League City?
About two months from signing. League City’s Building Department and Fire Marshal’s Office both review the plans, and the city wants the state’s windstorm certificate on file before its final inspection. We file the permit, get your HOA’s approval and apply to TNMP or CenterPoint, whichever owns your lines.
- Permit, HOA and utility. About 4 to 6 weeks.
- Installation. Usually 1 to 2 days, by our crew.
- Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.
In League City
- Permit
- City of League City Building Department, applied for on the city’s online permit portal and reviewed with the Fire Marshal’s Office.
- Plans
- A site plan and racking layout, plus mounting, electrical and structural sheets sealed by an engineer and drawn to the city’s adopted codes, including its design wind speed.
- Fee
- $300 for a solar panel permit, on the city’s fee schedule since August 1, 2026.
- Windstorm
- A WPI-8 certificate of compliance from the Texas Department of Insurance, uploaded and approved before the city’s final inspection.
- Inspections
- The Fire Marshal’s final site inspection, then the Building Department’s final. The Building Department schedules requests made by 3 p.m. for the next business day.
- Utility
- Texas-New Mexico Power or CenterPoint, depending on your street. Both are open to retail choice, so your plan, not the utility, credits the power you send back.
If your neighborhood has an HOA
League City doesn’t enforce HOA rules, so your HOA’s approval is a separate step from the city permit. Texas law lets an HOA set conditions on roof panels but, with few exceptions, not forbid them. It can make you get its approval first and refuse panels that extend above or beyond the roofline, that neither follow the roof’s slope nor have a top edge parallel to the roofline, or whose frames, brackets or visible wiring aren’t black, bronze or silver. It can also choose where on the roof they go, unless a different location would produce more than 10% more power. We get the approval for you.
Permit, plans, fee and inspections from the City of League City’s Building Department pages (Solar Panels, Inspections and the fee schedule); the windstorm certificate from the Texas Department of Insurance; utilities from TNMP’s tariff and the Public Utility Commission’s Power to Choose data for ZIP 77573; HOAs from Texas Property Code §202.010. Checked November 2026. Your address decides which utility you’re on.
What does solar cost in League City?
Find your monthly kWh on your electricity bill and read across: that’s the system a League City roof needs to cover 90 to 100% of your use, and its price before incentives. At the Texas average of 1,096 kWh a month, that’s about 8.6 kW, roughly $17,900 to $20,200.
Incentives: Texas has no state solar tax credit, and the 30% federal credit for homeowners ended with 2025. The state’s own incentive is a property tax exemption on the value solar adds to your home, claimed from your county appraisal district on Form 50-123.
Texas incentives in fullBy monthly use
1,096 kWhTexas average
System8.6 kW
Panels20
Before incentives$17,900 to $20,200
1,500 kWh
System11.8 kW
Panels27
Before incentives$24,600 to $27,600
2,000 kWh
System15.7 kW
Panels36
Before incentives$32,800 to $36,800
2,500 kWh
System19.7 kW
Panels45
Before incentives$40,900 to $46,100
Work it out for your own bill
Add up the kWh on your last 12 bills, or multiply one month by 12.
- System in League City
- 8.6 kW20 panels
- At one IntegrateSun project’s price ($2.08/W)
- $17,900
- At League City’s average ($2.34/W)
- $20,200
- Before any incentives
- $17,900 to $20,200
Sizing: League City’s 5.22 peak sun hours a day (PVWatts for central Houston, 24 miles away) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s League City average as of November 2026. Texas average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.
Who buys back solar power in League City?
Not TNMP or CenterPoint. Whichever of the two owns your lines connects your system, but Texas law has you sell the surplus to the retail electricity provider you buy from, at a value the two of you agree. So in League City the plan you choose, not the utility, sets what exported solar earns, and its Electricity Facts Label spells out the credit.
Before we size your system, we check which utility serves your street and what your plan pays.
Compare plans on Power to Choose (the state’s site, opens in a new tab)Two utilities, one ZIP code. Power to Choose lists plans for both TNMP and CenterPoint in League City’s 77573 ZIP code, so compare the plans for your own utility.
What to compare before you sign
- Credit per kWh
- Does each kWh you send back earn your full price per kWh, or a lower set rate?
- Cap
- Is every kWh credited, or only up to what you use that month?
- Carryover
- Do leftover credits roll over to next month, or are they paid out or lost?
- Fees and contract
- What are the monthly fee, the contract length and the fee for leaving early?
- Switching
- What happens to unused credits if you change plans? Some plans forfeit them.
How the plan changes the design
A plan that credits close to your full rate
Power you send back is worth nearly as much as power you use, so covering your whole year’s use with panels makes sense.
A plan that credits much less
Solar is worth most when it’s used as it’s made, so a battery that stores the midday surplus for the evening adds more.
Texas Utilities Code §39.916 (selling surplus to your retail provider; connecting through Texas-New Mexico Power or CenterPoint). Credits set out in the Electricity Facts Label, and unused credits forfeited on leaving: a large Texas provider’s own solar plan page. Checked November 2026. No provider is named: plans and rates change monthly.
How much do solar panels cost in League City?
About $17,900 to $20,200 before incentives, for the roughly 8.6 kW of panels a household at the Texas average, 1,096 kWh a month, needs here. At 2,000 kWh a month it’s about 15.7 kW, or $32,800 to $36,800. Those prices run from one IntegrateSun project’s $2.08 a watt to EnergySage’s League City average of $2.34 (November 2026); your roof and equipment set the real price.
Prices by monthly useDo I need a permit for solar panels in League City?
Yes. League City’s Building Department issues it, and the Fire Marshal’s Office reviews the plans as well. The application needs mounting, electrical and structural sheets sealed by an engineer and drawn to the city’s design wind speed, and the solar panel permit fee is $300. We prepare and file it for you.
How an install runs hereDo solar panels in League City need a windstorm certificate?
Yes. Before the Building Department’s final inspection can be requested, the city needs a WPI-8, the Texas Department of Insurance’s windstorm certificate of compliance, uploaded and approved, along with a passed Fire Marshal inspection. League City is inside the coastal area where the state’s windstorm inspections apply, and TDI requires a WPI-8 for a building to be eligible for wind and hail coverage from the Texas Windstorm Insurance Association.
Is my League City home on TNMP or CenterPoint?
It depends on your street. Texas-New Mexico Power (TNMP) lists League City in its service area, CenterPoint serves other parts of town, and the 77573 ZIP code has both. Either way you choose your own electricity plan, and we design your system around your utility and your plan’s rates. CenterPoint’s storm record is on our Houston page.
CenterPoint’s outage recordWill solar panels keep my power on after a hurricane in League City?
Only with a battery. In an outage, grid-tied panels stop sending power so none flows onto lines that crews are repairing; a battery carries the circuits you choose, and one Powerwall 3 covers the fridge, lights, Wi-Fi and chargers for about 27 hours. Hurricane Beryl left 81% of TNMP’s Gulf Coast customers without power in July 2024, and full restoration took 10 days.
TNMP’s outage recordCan my HOA in League City stop me from going solar?
Generally no, but it can set conditions. Texas law voids most HOA bans on solar panels; an HOA may still insist on approving them first and turn down roof panels that extend above or beyond the roofline, that neither follow the roof’s slope nor have a top edge parallel to the roofline, or whose frames aren’t black, bronze or silver. League City doesn’t enforce HOA rules, so that approval is a separate step from the city permit. We handle both.
How long does it take to go solar in League City?
About two months from signing, though permit, utility and inspection schedules can move it. Paperwork comes first: about 4 to 6 weeks for the city permit, your HOA’s approval and the utility application. Our crew then installs, usually in 1 to 2 days. Inspections and the utility’s permission to operate follow, over about 2 to 3 weeks; in League City, the Fire Marshal’s inspection and the state’s windstorm certificate both have to be in before the city’s final inspection.
Where is IntegrateSun based?
In Houston: our headquarters is at 7055 Old Katy Rd, Suite 505, Houston, TX 77024, about 28 miles from League City in a straight line. Our installation crew is based there and installs here, and we handle your permit, HOA approval and utility application.

Ready to make your own power?
Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.