Skip to content

Your HOA can’t ban solar. It can pick the spot. Solar panel installation in Pearland, by our crew from Houston, about 18 miles away.

Texas law stops an HOA from banning solar panels, but it can still say where they go. In Shadow Creek Ranch, that’s the part of the roof least visible from the street. We get your HOA’s approval, file the city permit and handle the hookup with CenterPoint or TNMP.
  • 18 milesfrom our Houston office, where our crew is based
  • 3 to 5 business daysfor the City of Pearland to review a solar permit
  • TECL 35074Texas electrical contractor license
Central Pearland is about 18 miles southeast of our office. Our Houston crew also installs in nearby League City, Pasadena and Deer Park.

How does going solar work in Pearland?

It takes about two months from signing. We get your HOA’s written approval, file the permit with the City of Pearland and apply to CenterPoint, or to Texas-New Mexico Power if your home is in the small part of town it serves. The city lists 3 to 5 business days to review a solar permit.

  1. Permit, HOA and utility. About 4 to 6 weeks.
  2. Installation. Usually 1 to 2 days, by our crew.
  3. Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.
Permits in other Houston-area towns

In Pearland

Permit from
For homes inside city limits, the City of Pearland’s Permits and Inspections office, in Community Development. Applications, fees and inspection requests go through the city’s Cityworks portal.
City review
3 to 5 business days for solar panels, for a first submittal and for a resubmittal.
Inspections
Requests made in Cityworks by 4:00 p.m. are scheduled for the next business day, later ones within two business days. The city doesn’t give appointment times.
Utility
CenterPoint across most of Pearland, Texas-New Mexico Power in a small part of town. Whichever serves your address connects the system and gives permission to turn it on.
Exported solar
Credited by the retail electricity plan you choose, not by the utility. Both parts of town are open to retail choice.
Shadow Creek Ranch
Written approval from the association’s Architectural Review Committee first. Roof panels go where they’re least visible from the street or common areas, unless that spot would make more than 10% less power than another.

If your neighborhood has an HOA

Texas Property Code §202.010 voids HOA rules that ban or restrict solar panels, within set limits. An association may still require its approval before you install, keep roof panels below the roofline and in line with the roof’s slope, and name the part of the roof they go on, unless another spot would make more than 10% more power a year. Panels on the ground can be limited to a fenced yard, no taller than the fence.

Permit office, review time and inspections from the City of Pearland’s Community Development pages; utilities from Texas-New Mexico Power’s list of the Gulf Coast communities it serves and the Public Utility Commission’s Power to Choose plans by ZIP code; Shadow Creek Ranch from its association’s architectural review page and its recorded Architectural Review Specifications (December 15, 2025); HOAs from Texas Property Code §202.010. Checked November 2026. Your address decides your utility.

What does solar cost in Pearland?

Find your monthly kWh on your electricity bill and read across: that’s the system a Pearland roof needs to cover 90 to 100% of your use, and its price before incentives. At the Texas average of 1,096 kWh a month, that’s about 8.6 kW, roughly $17,900 to $19,200.

Incentives: No state credit, since Texas has no personal income tax, and the 30% federal credit for homeowners ended with 2025. The value solar adds to a Pearland home is exempt from property tax: apply to your county appraisal district on Form 50-123.

Every Texas incentive

By monthly use

  • 1,096 kWhTexas average

    System8.6 kW

    Panels20

    Before incentives$17,900 to $19,200

  • 1,500 kWh

    System11.8 kW

    Panels27

    Before incentives$24,600 to $26,200

  • 2,000 kWh

    System15.7 kW

    Panels36

    Before incentives$32,800 to $35,000

  • 2,500 kWh

    System19.7 kW

    Panels45

    Before incentives$40,900 to $43,700

Work it out for your own bill

Add up the kWh on your last 12 bills, or multiply one month by 12.

kWh
4,000 kWh30,000 kWh
System in Pearland
8.6 kW20 panels
At one IntegrateSun project’s price ($2.08/W)
$17,900
At Pearland’s average ($2.22/W)
$19,200
Before any incentives
$17,900 to $19,200

Sizing: Pearland’s 5.22 peak sun hours a day (PVWatts for central Houston, 14 miles away) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s Pearland average as of November 2026. Texas average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.

Who buys back solar power in Pearland?

Your retail electricity provider, not the utility. CenterPoint, or TNMP in the small part of Pearland it serves, owns the lines and connects your panels. Texas law has you sell the extra power to the company you buy electricity from, on terms the two of you agree. Check those terms in your plan’s Electricity Facts Label.

We check your plan’s terms and rates before we size your system.

Compare plans on Power to Choose (the state’s site, opens in a new tab)

On TNMP’s lines? The same rule applies. Power to Choose lists retail plans for TNMP addresses in Pearland’s ZIP codes too, and the one you sign up for decides what your extra solar earns.

Ask these before you sign

Credit per kWh
Does each kWh you send back earn your full price per kWh, or a lower set rate?
Cap
Is every kWh credited, or only up to what you use that month?
Carryover
Do leftover credits roll over to next month, or are they paid out or lost?
Fees and contract
What are the monthly fee, the contract length and the fee for leaving early?
Switching
What happens to unused credits if you change plans? Some plans forfeit them.

What the answers change

  • A plan that credits close to your full rate

    Power you send back is worth nearly as much as power you use, so covering your whole year’s use with panels makes sense.

  • A plan that credits much less

    Solar is worth most when it’s used as it’s made, so a battery that stores the midday surplus for the evening adds more.

Texas Utilities Code §39.916 (selling surplus to your retail provider; connecting through CenterPoint or Texas-New Mexico Power). Credits set out in the Electricity Facts Label, and unused credits forfeited on leaving: a large Texas provider’s own solar plan page. Checked November 2026. No provider is named: plans and rates change monthly.

What Pearland homeowners ask about solar.

Not answered here? Ask us directly.

Call (855) 999-1850

How much do solar panels cost in Pearland?

About $17,900 to $19,200 before incentives for a Pearland home that uses the Texas average of 1,096 kWh a month: that takes about 8.6 kW of panels. At 2,000 kWh a month you’d need about 15.7 kW, $32,800 to $35,000. Those prices use one IntegrateSun project’s $2.08 a watt and EnergySage’s Pearland average of $2.22 (November 2026).

Prices by monthly use

Do I need a permit to install solar panels in Pearland?

Yes. Inside city limits, the City of Pearland’s Permits and Inspections office reviews solar panel permits, and it lists 3 to 5 business days for a first submittal or a resubmittal. Applications and inspection requests go through the city’s Cityworks portal. We file the permit and arrange the inspections.

How it works in Pearland

How long does solar installation take in Pearland?

Plan on about two months from signing. Clearing the city permit, your HOA and CenterPoint or TNMP takes about 4 to 6 weeks, of which the city’s own review is listed at 3 to 5 business days. Our crew installs in 1 to 2 days, then inspection and permission to operate take about 2 to 3 weeks.

Is Pearland on CenterPoint or TNMP?

Mostly CenterPoint. Texas-New Mexico Power (TNMP) serves what it calls a small portion of town, and both appear in the same Pearland ZIP codes, so your address decides. Either way you choose your own electricity provider, and that plan sets what the solar you send back earns.

Who buys your extra solar

Can I put solar panels on my house in Shadow Creek Ranch?

Yes. Texas law voids HOA rules that ban solar panels, but Shadow Creek Ranch’s association must approve them in writing first and has a say in where they go. Its Architectural Review Specifications put roof panels where they’re least visible from the street or common areas, unless that spot would make more than 10% less power than another. Panels follow the roof’s slope, don’t rise above or reach past the roof section they sit on, and have frames in silver, bronze, black or a color that matches the shingles. Some of its villages have their own solar guidelines too. We handle the approval.

Will solar panels keep my power on in a Pearland outage?

Only with a battery. Panels tied to the grid shut off when it goes down, so line crews can work safely. A battery keeps the circuits you choose running and refills from the panels each sunny day. On one Powerwall 3, the fridge, lights, Wi-Fi, chargers and a few outlets last about 27 hours.

CenterPoint’s outage record

Where is IntegrateSun based?

In Houston: our headquarters is at 7055 Old Katy Rd, Suite 505, Houston, TX 77024, about 18 miles from central Pearland. The crew that installs in Pearland is based there. Call (855) 999-1850 for a free quote.

Two installers in safety harnesses working on a roof, with rope and boxes of equipment around them

Ready to make your own power?

Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.