Rockville permits it, Pepco credits it. Solar panel installation in Rockville, Maryland, from the installation team we employ here.

Rockville runs its own permit office, and a standard rooftop system can now get its permit online as soon as the design passes an automated code check and the fee is paid. Pepco connects your panels, and under Maryland net metering, open to new systems until July 1, 2027, every kWh they send back is credited against one you buy. We handle the permit, your HOA and the Pepco hookup.
  • Rockvillebase of one of our Maryland installation teams
  • 5,000+installations since 2017
  • Solar Access Programon the Maryland Energy Administration’s FY27 contractor list
Our local team is based in Rockville. With our team in Mechanicsville, it covers all of Maryland, including Bethesda, Silver Spring and Germantown nearby.

How does going solar work in Rockville?

Two sign-offs, and we handle both. The City of Rockville permits and inspects the system, instantly online when a standard rooftop design passes SolarAPP+, or through the city’s standard review. Pepco reviews the interconnection under Maryland’s rules and gives permission to operate once the city has approved the work.

  1. Permit, HOA and utility. About 4 to 6 weeks.
  2. Installation. Usually 1 to 2 days, by our crew.
  3. Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.

What Rockville and Pepco require

Permit
The City of Rockville’s Inspection Services Division issues a Residential Solar Panel Permit, applied for online with architectural and structural drawings and a plot plan, and checks the work against the 2021 International Residential Code and the 2023 National Electrical Code.
Instant permit
Under a city pilot, a standard rooftop system, battery included, can go through SolarAPP+, which checks the design against code automatically. Once it passes and the fee is paid, the permit is issued immediately. Homes in a historic district or a Special Flood Hazard Area take the standard review.
Inspection
The city inspects the finished install, and Pepco won’t give permission to operate until local code officials have approved it.
Historic districts
A house in a city historic district needs a Certificate of Approval for exterior changes. Since August 1, 2026, city staff can approve solar panels and solar shingles or tiles on a roof without a Historic District Commission hearing.
Utility hookup
Pepco. An inverter-based system of 20 kW or less gets Maryland’s simplest review, with no application fee: Pepco has 5 business days to confirm the application is complete and 15 more to check it, then 20 business days to give permission to operate once the final paperwork is in.
Exports
Net metered by Pepco: each kWh you send back is credited against one you buy. The rules are below.

HOA rules: Maryland’s solar access law

An HOA or deed covenant can’t put unreasonable limits on solar on a roof you own or have exclusive use of. Under Real Property § 2-119, a rule is unreasonable if it adds at least 5% to the installed cost or cuts the system’s output by at least 10%, shown by an independent designer who is NABCEP-certified or has designed at least 30 systems in the past 3 years. Common areas, and historic properties listed on, or eligible for, the Maryland Register, are outside it.

City of Rockville: Apply for a Building or Trade Permit, Apply for an Automated Residential Solar Permit, Make Alterations to a Historic Property, and Building and Safety Codes. Maryland’s small generator interconnection rules (COMAR 20.50.09). Maryland Real Property Article § 2-119. Checked November 2026.

What does solar cost in Rockville?

Find your monthly kWh on your electricity bill and read across: that’s the system a Rockville roof needs to cover 90 to 100% of your use, and its price before incentives. At the Maryland average of 929 kWh a month, that’s about 7.8 kW, roughly $16,300 to $20,700.

Incentives: The 30% federal credit for homeowners ended with 2025, and Montgomery County’s solar property tax credit is suspended. Maryland still gives you SRECs to sell, no sales or property tax on the equipment, a rebate of up to $7,500 if your household qualifies, and 30% back on a battery, up to $5,000.

Maryland incentives in full

By monthly use

  • 929 kWhMaryland average

    System7.8 kW

    Panels18

    Before incentives$16,300 to $20,700

  • 1,500 kWh

    System12.6 kW

    Panels29

    Before incentives$26,300 to $33,500

  • 2,000 kWh

    System16.8 kW

    Panels39

    Before incentives$35,000 to $44,600

  • 2,500 kWh

    System21.1 kW

    Panels48

    Before incentives$43,800 to $55,800

Work it out for your own bill

Add up the kWh on your last 12 bills, or multiply one month by 12.

kWh
4,000 kWh30,000 kWh
System in Rockville
7.8 kW18 panels
At one IntegrateSun project’s price ($2.08/W)
$16,300
At Rockville’s average ($2.65/W)
$20,700
Before any incentives
$16,300 to $20,700

Sizing: Rockville’s 4.88 peak sun hours a day (PVWatts for Baltimore, Maryland’s representative city) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s Rockville average as of November 2026. Maryland average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.

What does Pepco credit for solar you send back?

The full price of power, kWh for kWh, while net metering lasts. Pepco nets what your panels send back against what you buy, and any surplus carries forward as a kWh credit. Once a year, after your April bill, credit you haven’t used is paid at the generation rate unless you’ve chosen to keep carrying it. Net metering closes to new systems on July 1, 2027.

We look at your Pepco bills and your last year of use when we design your system.

How Maryland’s utilities credit solar

After net metering closes? New systems move to the program that replaces net metering. The Public Service Commission must approve its framework by February 1, 2027, and the law intends it to pay less.

Pepco’s net metering, rule by rule

Netting
Each bill nets the power your panels send back against the power you buy, kWh for kWh, on the same rates and charges you’d pay without solar.
Surplus months
In a month your panels make more than your home uses, you pay only the customer charge, and the extra becomes a kWh credit.
Carryover
Credit carries forward for up to 12 months, through your April bill.
April payout
Credit still unused then is paid out at the generation or commodity rate, unless you’ve asked to carry it forward indefinitely instead.
Who can join
New systems until July 1, 2027, or sooner if net-metered capacity statewide reaches 3,000 MW. A system under a net metering contract by then keeps it until it’s decommissioned, enlarged, repowered or signs a new interconnection agreement. The Public Service Commission is still deciding which step counts by that date.

How the rules shape the design

  • Sized to your year’s use

    Every kWh you send back stands in for one you’d have bought, so panels that cover close to a year of use get the most from net metering.

  • Sized past it

    What you don’t use by April is paid at the generation rate, not the full price of power, so extra panels earn less.

Maryland Public Utilities Article § 7-306 as amended in 2026 (net metering and the program that replaces it), checked November 2026. Your rates and customer charge are on your Pepco bill.

What Rockville homeowners ask about solar.

Not answered here? Ask us directly.

Call (855) 999-1850

How much do solar panels cost in Rockville?

Roughly $16,300 to $20,700 before incentives for a home that uses the Maryland average of 929 kWh a month: about 7.8 kW of panels on a Rockville roof. At 1,500 kWh a month it’s about 12.6 kW, or $26,300 to $33,500. Your roof, your equipment and any battery set the real price.

See prices by monthly use

Do I need a permit for solar panels in Rockville?

Yes, from the City of Rockville, whose Inspection Services Division issues a Residential Solar Panel Permit. A standard rooftop system, battery included, can instead pass SolarAPP+’s automated code check and get its permit as soon as the fee is paid, unless the home is in a historic district or a Special Flood Hazard Area. We apply for it, and Pepco won’t switch the system on until the city has approved the work.

What Rockville and Pepco require

How long does it take to go solar in Rockville?

Typically around two months, depending on permit, Pepco and inspection schedules. Expect 4 to 6 weeks for the city permit, any HOA approval and Pepco’s interconnection review, 1 to 2 days for our crew to install, then about 2 to 3 weeks for the city’s inspection and Pepco’s permission to operate. For an inverter-based system of 20 kW or less, Maryland’s rules give Pepco 20 business days to grant permission once the final paperwork is in.

Can I put solar panels on a historic house in Rockville?

Yes, with the city’s approval. A house in a Rockville historic district needs a Certificate of Approval for exterior changes, and since August 1, 2026 city staff can approve solar panels and solar shingles or tiles on a roof without a Historic District Commission hearing. These homes take the standard permit review rather than the instant one, and Maryland’s HOA solar law doesn’t cover historic properties listed on, or eligible for, the state register.

Permits and historic review

Does Montgomery County give a tax credit for solar panels?

No. Montgomery County has suspended its property tax credit for solar and geothermal devices, and the City of Rockville has no solar credit of its own. Maryland law still keeps solar energy property out of your real property tax, and the state’s Solar Access Program pays up to $7,500 if your household qualifies.

Maryland incentives in full

Does Pepco buy back extra solar power?

Once a year, for credit you haven’t used. Through the year, Maryland net metering credits each kWh your panels send back against a kWh you buy, and in a month you send back more, you pay only the customer charge and the extra carries forward. After your April bill, Pepco pays for unused credit at the generation rate, unless you’ve asked to carry it forward indefinitely. New systems can join net metering until July 1, 2027.

Pepco’s net metering, rule by rule

Will solar panels keep my power on when Pepco’s grid goes down?

Not by themselves. Panels tied to Pepco’s grid shut off automatically in an outage, so no power flows back onto lines that crews are repairing. Add a battery and the circuits you pick keep running, with the panels recharging it by day: a single Powerwall 3 can keep the fridge, lights, Wi-Fi, chargers and a few outlets going for about 27 hours. Maryland’s energy storage grant covers 30% of a home battery’s installed cost, up to $5,000, when the reservation is approved before installation.

How long a battery lasts

Does IntegrateSun have a team in Rockville?

Yes. One of our Maryland installation teams is based in Rockville and another in Mechanicsville, and together they cover the whole state. Our headquarters is in Houston. Call (855) 999-1850 for a free quote.

Where we install in Maryland
Two installers in safety harnesses working on a roof, with rope and boxes of equipment around them

Ready to make your own power?

Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.