Skip to content

High-desert sun, netted every quarter hour. Solar panel installation in Reno, by the installation team we employ here.

Reno is on NV Energy’s northern system, where new solar is netted every 15 minutes: power you use as it’s made saves about 11.5¢ a kWh, and the surplus earns 8.245¢. We size for that, file the city permit, handle your HOA and set up the NV Energy hookup.
Our local team is based in Reno. With our team in Henderson, it covers the whole state, Sparks and Carson City included.

How does going solar work in Reno?

The City of Reno permits the system and inspects it, and NV Energy connects it. There’s no instant permit here: every system needs a full plan set with an engineer’s stamped check of the roof, which we prepare and file, then a plan review before work starts.

  1. Permit, HOA and utility. About 4 to 6 weeks.
  2. Installation. Usually 1 to 2 days, by our crew.
  3. Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.

Who signs off in Reno

Permit
The city’s Development Services Department issues a residential solar permit, applied for online through the regional ONE permitting portal, OneNV.us. Reno is a SolSmart Silver community, recognized in part for streamlining permits.
Plans
A full plan set, with no instant online option: a drawn site plan showing the panels and fire access paths, an electrical design with a three-line diagram, racking details, and an engineer’s stamped structural calculations for snow, wind and seismic loads, with a letter on whether your roof can carry the panels and any reinforcement it needs.
Fees
Set by the contract price: a $45 application fee, a permit fee from the city’s valuation table, plan review at 65% of that fee, and a $45 issuance fee. On a $16,000 system, that’s about $592, before any other department’s fees.
Inspections
Booked online or in the city’s inspections app, and on the day the inspector texts an approximate arrival time. A licensed electrical contractor or journeyman electrician has to be on site for each one.
Utility hookup
NV Energy, through Sierra Pacific Power, its northern utility. It approves the net metering application (its current rider covers systems up to 25 kW), then installs and owns a two-way meter that records every 15 minutes.
Exports
Netted every 15 minutes, with any surplus credited at 75% of the energy price, a percentage you keep for 20 years. The rules are below.

HOA rules: Nevada’s solar access laws

An HOA can’t ban solar panels. Nevada law voids covenants that prohibit or unreasonably restrict them, including any rule that cuts a system’s output by more than 10%. Under a 2025 law, an HOA’s solar rules must require a licensed installer, and they can ask that panels not face the street, if that costs no more than 10% of their output, and that conduit be painted to match. You needn’t follow either of those two where it would add more than 3% to the system’s cash price.

City of Reno Development Services: Solar Permit Guidelines (updated July 1, 2025), its Building Permits page, and its fee schedules effective July 1, 2026. The City of Reno’s Going Solar page. SolarAPP+’s list of live jurisdictions. NV Energy’s Schedule NMR-2025 net metering rider. Nevada Revised Statutes 111.239, 278.0208 and 116.334. Checked November 2026.

What does solar cost in Reno?

Find your monthly kWh on your electricity bill and read across: that’s the system a Reno roof needs to cover 90 to 100% of your use, and its price before incentives. At the Nevada average of 930 kWh a month, that’s about 6.4 kW, roughly $13,300 to $16,000.

Incentives: Nevada has no state solar credit, since it has no personal income tax; the 30% federal credit for homeowners ended with 2025; and NV Energy’s solar and battery incentives are closed to new applications. What Nevada does give you: a home solar system is exempt from property tax.

Nevada incentives in full

By monthly use

  • 930 kWhNevada average

    System6.4 kW

    Panels15

    Before incentives$13,300 to $16,000

  • 1,500 kWh

    System10.3 kW

    Panels24

    Before incentives$21,400 to $25,800

  • 2,000 kWh

    System13.7 kW

    Panels32

    Before incentives$28,600 to $34,400

  • 2,500 kWh

    System17.2 kW

    Panels40

    Before incentives$35,700 to $43,000

Work it out for your own bill

Add up the kWh on your last 12 bills, or multiply one month by 12.

kWh
4,000 kWh30,000 kWh
System in Reno
6.4 kW15 panels
At one IntegrateSun project’s price ($2.08/W)
$13,300
At Reno’s average ($2.50/W)
$16,000
Before any incentives
$13,300 to $16,000

Sizing: Reno’s 5.98 peak sun hours a day (PVWatts) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s Reno average as of November 2026. Nevada average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.

What does NV Energy pay for solar in Reno?

8.245¢ a kWh for what you send back, after your home has used what it needs. NV Energy nets solar every 15 minutes in northern Nevada, so the power you use as it’s made saves the full price, about 11.5¢, and only each quarter hour’s surplus earns the lower credit.

We look at your NV Energy plan, its rates and your electricity use when we design your system.

Nevada’s net metering tiers (Public Utilities Commission of Nevada, opens in a new tab)

Already have solar? Systems approved before October 1, 2025 stay on NV Energy’s earlier net metering rider unless the owner asks to move to the 15-minute one.

NV Energy’s northern net metering, rule by rule

Netting
Every 15 minutes, NV Energy counts only what your panels send out after your home has used what it needs. Solar you use as it’s made never reaches NV Energy’s meter, so it saves the full price, about 11.5¢ a kWh on the standard plan.
Credit per kWh
Each 15 minutes’ surplus earns 75% of the energy price: 8.245¢ a kWh on rates in effect since July 1, 2026. The cents move when NV Energy’s rates change.
Your percentage
75% is the tier open now, with no capacity limit, and you keep it for 20 years at your address.
Carryover
Credit left on a monthly bill rolls over to the next one. Solar homes pay the same basic service charge as other homes: $18.50 a month on the standard plan.
Time of use
Optional. From June through September, power from 3 to 9 PM costs about 50¢ a kWh, and solar sent back in those hours earns about 37¢. At all other times, credits run about 6¢.

How the rules shape the design

  • Panels only

    Solar used as it’s made saves about 11.5¢ a kWh, and what goes back earns 8.245¢. So the more of your solar you use at home, the more each panel is worth.

  • Panels and a battery

    The battery stores the midday surplus for the evening, so less goes back at 8.245¢ and less is bought at about 11.5¢. It also keeps the circuits you choose on in an outage.

NV Energy (Sierra Pacific Power) Schedule NMR-2025 net metering rider, effective October 1, 2025, and its customer-generator rate sheet in effect from July 1, 2026, before local government fees; the Public Utilities Commission of Nevada’s net metering page. Checked November 2026.

What Reno homeowners ask about solar.

Not answered here? Ask us directly.

Call (855) 999-1850

How much do solar panels cost in Reno?

Roughly $13,300 to $16,000 before incentives, for the 6.4 kW of panels a Reno home using Nevada’s average 930 kWh a month needs. At 1,500 kWh a month, it’s about 10.3 kW and $21,400 to $25,800. The real price depends on your roof, the equipment you choose and whether you add a battery.

See prices by monthly use

Do I need a permit for solar panels in Reno?

Yes. The city’s Development Services Department issues a residential solar permit, applied for online through the regional OneNV.us portal. It needs a full plan set, including an engineer’s stamped letter on whether your roof can carry the panels, and the city’s fees follow the contract price: about $592 on a $16,000 system. We file it for you.

Who signs off in Reno

How long does it take to go solar in Reno?

Usually about two months from signing. The city permit, any HOA approval and the NV Energy application take about 4 to 6 weeks, installation usually takes 1 to 2 days with our crew, and the city’s inspections and NV Energy’s permission to operate take about 2 to 3 weeks more. Reno has no instant online solar permit, so every system goes through plan review.

How does NV Energy’s 15-minute net metering work in Reno?

Your meter settles up every 15 minutes. Solar your home uses as it’s made saves the full price, about 11.5¢ a kWh; whatever is left over in each 15 minutes goes to the grid and earns 75% of the energy price, 8.245¢ a kWh on rates in effect since July 1, 2026. Credits roll over from bill to bill, and you keep the 75% for 20 years. It applies to systems approved since October 1, 2025.

NV Energy’s rules, row by row

Can solar panels handle Reno’s snow?

They’re engineered for it, and the city checks. Every Reno solar permit needs structural calculations covering snow, wind and seismic loads, stamped by an engineer, plus the engineer’s letter on whether your roof can carry the panels and any reinforcement it needs. We mount panels on IronRidge racking.

Can my HOA stop me from going solar in Reno?

No. Nevada law voids any covenant that prohibits or unreasonably restricts solar, including a rule that cuts a system’s output by more than 10%. Under a 2025 law, an HOA can ask that panels not face the street, if that costs no more than 10% of their output, and that conduit be painted to match your house, but you needn’t follow either rule where it would add more than 3% to the system’s cash price. We handle the HOA application.

Will solar panels keep my power on in a Reno outage?

Only with a battery. Panels wired to NV Energy’s grid shut themselves off whenever its lines go dead, which protects anyone repairing them. A battery keeps the circuits you pick running and takes a top-up from the panels whenever the sun is out: a single Powerwall 3 can carry a fridge, lights, Wi-Fi, phone chargers and a few outlets for roughly 27 hours. Nevada law also requires NV Energy’s natural disaster plan to propose protocols for switching off power lines in a fire.

How long a battery lasts

Does IntegrateSun have a team in Reno?

Yes. Our installation team is based in Reno, and with our team in Henderson it covers all of Nevada. Our headquarters is in Houston. Call (855) 999-1850 for a free quote.

Where we install in Nevada
Two installers in safety harnesses working on a roof, with rope and boxes of equipment around them

Ready to make your own power?

Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.