Skip to content

Oklahoma City sun, an Oklahoma City crew. Solar panel installation in Oklahoma City, by our team based in the city.

OG&E serves Oklahoma City and nets the solar you send back against the power you buy each month. Our installation team works out of Oklahoma City and covers the whole state. We file the city permit, handle your HOA and set up the OG&E hookup.
  • Oklahoma Citybase of our installation team, which covers all of Oklahoma
  • 5.45 hoursof peak sun a day on a south-facing Oklahoma City roof
  • 5,000+installations since 2017
Our local team is based in Oklahoma City. It installs across the metro, including Edmond, Norman, Moore and Midwest City, and across the rest of Oklahoma.

What happens when Oklahoma City’s power goes out?

Your panels shut off with the grid unless a battery stands behind them. With one, the circuits you pick keep running, and the roof recharges it each sunny day. Here, ice takes the grid down as well as wind: the October 2020 ice storm caused about 422,000 outages across OG&E’s system, and 10 days on, crews were still restoring power.

Panels alone
Off with the grid, and back on when it is.
Panels and a battery
The fridge, lights, Wi-Fi, chargers and a few outlets run for about 27 hours on one Powerwall 3, refilled by the panels each sunny day.
How long a battery lasts in your home

The outage record

  • March 2025Wind and wildfires

    9%

    Nearly 78,000 customers affected, restored within 48 hours.

  • April 2024Spring tornadoes

    17%

    150,000 customers affected, restored within 48 hours.

Each bar is OG&E’s count of customers affected, as a share of all its customers in its latest annual report at the time. OG&E serves about 30,000 square miles of Oklahoma and western Arkansas, so these are systemwide counts, not Oklahoma City’s. From OG&E’s own releases and OGE Energy’s SEC filings, checked November 2026.

How does going solar work in Oklahoma City?

Two sign-offs, and we handle both. The city permits the system and inspects the work. OG&E reviews the hookup before the panels go up, then gives permission to operate at the end.

  1. Permit, HOA and utility. About 4 to 6 weeks.
  2. Installation. Usually 1 to 2 days, by our crew.
  3. Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.

Who signs off in Oklahoma City

Permit
The city’s Development Services Department. Only a licensed electrical contractor registered with the city can apply, online or in person, with electrical drawings stamped by an Oklahoma-licensed electrical engineer and the equipment’s specifications.
Roof layout
The plans show where the array sits and keep roof access walking paths clear: around the edge of the roof, along the valleys and the ridge, and in front of egress windows.
Fees
Since July 1, 2026, the city charges $120 for a solar installation under the electrical code and $96 under the building code.
Historic districts
In the city’s historic preservation and landmark zones, among them Heritage Hills, Mesta Park and Crown Heights, changes to a building need a Certificate of Appropriateness from the Historic Preservation Commission or Planning staff. We check before we file.
Utility hookup
OG&E. It reviews a complete net metering application in 30 business days and wants a lockable outdoor disconnect switch within 10 feet of the production meter. The system stays off until OG&E gives permission to operate.
Exports
Netted against the power you buy each month. Only a monthly surplus earns OG&E’s lower avoided energy cost. The rules are below.

City of Oklahoma City: Solar Panel Submittal Requirements, its permit, inspection and historic preservation pages, and its fee schedule in force since July 1, 2026. OG&E’s customer-owned solar FAQs. Checked November 2026.

What does solar cost in Oklahoma City?

Find your monthly kWh on your electricity bill and read across: that’s the system a Oklahoma City roof needs to cover 90 to 100% of your use, and its price before incentives. At the Oklahoma average of 1,079 kWh a month, that’s about 8.1 kW, roughly $16,900 to $20,700.

Incentives: Oklahoma has no state tax credit for home solar, the 30% federal credit for homeowners ended with 2025, and OG&E offers no solar rebate. What counts is net metering: OG&E nets the solar you send back against the power you buy each month.

Oklahoma incentives in full

By monthly use

  • 1,079 kWhOklahoma average

    System8.1 kW

    Panels19

    Before incentives$16,900 to $20,700

  • 1,500 kWh

    System11.3 kW

    Panels26

    Before incentives$23,500 to $28,800

  • 2,000 kWh

    System15.1 kW

    Panels35

    Before incentives$31,400 to $38,500

  • 2,500 kWh

    System18.9 kW

    Panels43

    Before incentives$39,200 to $48,100

Work it out for your own bill

Add up the kWh on your last 12 bills, or multiply one month by 12.

kWh
4,000 kWh30,000 kWh
System in Oklahoma City
8.1 kW19 panels
At one IntegrateSun project’s price ($2.08/W)
$16,900
At Oklahoma City’s average ($2.55/W)
$20,700
Before any incentives
$16,900 to $20,700

Sizing: Oklahoma City’s 5.45 peak sun hours a day (PVWatts) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s Oklahoma City average as of November 2026. Oklahoma average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.

What does solar you send back earn in Oklahoma City?

Mostly the full price of power. OG&E nets what your panels send back against what you buy in each monthly billing period, so exported solar cancels power you’d otherwise pay for. Only a surplus left at the end of the month earns less: OG&E’s avoided energy cost, credited or paid on the next bill.

We look at your OG&E rate plan and your last year of use when we design your system.

Read OG&E’s solar FAQs (OG&E’s site, opens in a new tab)

Billed by another utility? Its own solar rules apply instead, and we check them when we design your system.

OG&E’s net metering, rule by rule

Netting
Each monthly billing period, OG&E subtracts the power your panels send back from the power you buy, and bills you for the difference.
A monthly surplus
If you send back more than you use in a month, OG&E credits or pays the difference in dollars on your next bill, at its on- or off-peak avoided energy cost: less than you pay for power.
Time of use
Required for solar homes. On SmartHours, power costs the most from 2 PM to 7 PM on weekdays, June to September, and the same all day from October to May.
Size limit
Up to 300 kW, and no more than 125% of your peak load. A system past 125% comes off net metering and onto OG&E’s qualifying facility tariff.
Meters
A two-way net meter, at no extra charge, and a second meter base that captures everything your panels make. Reprogramming the meter can take up to 7 business days after approval.

How the rules shape the design

  • Sized to your use

    Most of what you send back cancels power you’d buy that month at full price, so each panel earns close to the retail rate.

  • Sized past it

    Monthly surpluses grow and earn only the avoided energy cost, and past 125% of your peak load the system leaves net metering, so extra panels add little.

OG&E’s customer-owned solar FAQs and SmartHours page, and the Oklahoma Corporation Commission’s net metering rules (17 O.S. 156, OAC 165:40-9), checked November 2026. OG&E publishes its avoided energy cost in a separate tool, so no rate is printed here.

What Oklahoma City homeowners ask about solar.

Not answered here? Ask us directly.

Call (855) 999-1850

How much do solar panels cost in Oklahoma City?

About $16,900 to $20,700 before incentives for a home using the Oklahoma average of 1,079 kWh a month, which takes about 8.1 kW of panels on an Oklahoma City roof. At 2,000 kWh a month it’s about 15.1 kW: $31,400 to $38,500. Your roof, your equipment and any battery set the real price.

See prices by monthly use

Do I need a permit for solar panels in Oklahoma City?

Yes. The city’s Development Services Department issues it, and only a licensed electrical contractor can apply, with electrical drawings stamped by an Oklahoma-licensed electrical engineer and a roof layout that keeps walking paths clear. Since July 1, 2026, the city charges $120 under the electrical code and $96 under the building code. We file it for you.

Who signs off in Oklahoma City

How long does it take to go solar in Oklahoma City?

About two months from signing. The city permit, any HOA approval and OG&E’s review take about 4 to 6 weeks (OG&E reviews a complete application in 30 business days), installation takes 1 to 2 days with our crew, and the city inspection and OG&E’s permission to operate take about 2 to 3 weeks more.

Do I need OG&E’s approval before installing solar?

Yes. You apply to OG&E before the panels go up, and the system can’t run until OG&E has approved the interconnection and given permission to operate. OG&E also wants a lockable outdoor disconnect switch within 10 feet of the production meter and a second meter base that captures what your panels make. We handle the application.

Does OG&E offer a solar rebate?

Not currently. Oklahoma has no state tax credit for home solar either, and the 30% federal credit for homeowners ended with 2025. What OG&E does offer is net metering: the solar you send back is netted against the power you buy each month, so most of it is worth the full price of power.

Oklahoma incentives in full

Will solar panels keep my power on in an Oklahoma City outage?

Only with a battery. Grid-tied panels shut off when the grid goes down, so line crews can work safely; with a battery, the circuits you choose keep running and the panels recharge it on sunny days. A single Powerwall 3 keeps the fridge, lights, Wi-Fi, chargers and a few outlets going for about 27 hours. The October 2020 ice storm caused about 422,000 outages on OG&E’s system, and 10 days later crews were still restoring power.

OG&E’s outage record

Can solar panels handle Oklahoma City hail and tornadoes?

Not every storm. Basic hail certification means a panel came through 11 strikes from 1-inch ice balls at 51 mph, and the U.S. Department of Energy says that isn’t enough where hail is severe, so ask which hail test your panels passed. The National Weather Service lists 194 tornadoes in the Oklahoma City area since 1890, so check how your home insurance covers the panels too. We mount ours on IronRidge racking.

Does IntegrateSun have a team in Oklahoma City?

Yes. Our installation team is based in Oklahoma City and covers all of Oklahoma, from Edmond, Norman, Moore and Midwest City to Tulsa and Lawton. Our headquarters is in Houston. Call (855) 999-1850 for a free quote.

Where we install in Oklahoma
Two installers in safety harnesses working on a roof, with rope and boxes of equipment around them

Ready to make your own power?

Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.