Our own crew, based in Dallas. Solar panel installation in Dallas, by the IntegrateSun installation team based here.
- TECL 35074Texas electrical contractor license
- 5.41 hoursof peak sun a day on a Dallas roof (PVWatts)
- Oncorconnects your system; your plan buys the surplus
What happens when Dallas loses power?
Panels alone shut off when the grid does, so line crews can work safely. A home battery keeps the circuits you choose running, and the panels top it up each sunny day. Oncor’s record shows why that matters here: Winter Storm Uri’s rolling outages left more than 1.3 million of its customers in the dark at once in February 2021, and the May 2024 storm, with winds up to 95 mph, cut power to more than 650,000.
- Panels alone
- Off with the grid, and back on when it is.
- Panels and a battery
- The fridge, lights, Wi-Fi, chargers and a few outlets run for about 27 hours on one Powerwall 3, refilled by the panels each sunny day.
The outage record
March 2025The cross-Texas windstorm
8%
More than 335,000 customers out, all but fewer than 3,000 back within 2 days.
May 2024The DFW windstorm
16%
More than 650,000 customers affected, more than 600,000 back within 3 days.
February 2021Winter Storm Uri
35%
More than 1.3 million customers out, all but about 9,000 back within 5 days.
Each bar is the share of all Oncor customers (its points of delivery at the end of the year before) without power: at the peak for Winter Storm Uri and the March 2025 storm, and in all for May 2024. Oncor serves more than 400 Texas communities, so these are its systemwide counts. From Oncor’s own storm releases and SEC filings, checked November 2026.
How does going solar work in Dallas?
It takes about two months from signing. We file your permit with the City of Dallas and apply to Oncor to connect your system, and if you have an HOA, we get its approval. In a landmark district, the city’s Certificate of Appropriateness comes first.
- Permit, HOA and utility. About 4 to 6 weeks.
- Installation. Usually 1 to 2 days, by our crew.
- Inspection and switch-on. About 2 to 3 weeks, then the utility gives permission to operate.
In the City of Dallas
- Permit from
- The City of Dallas Planning and Development Department, applied for online through DallasNow. The city reviews the plans for zoning, the building code and fire safety, and a licensed engineer must review or seal them, including how the panels attach to your roof.
- Fees
- $15 at submittal, $577 for plan review and $125 for the building inspection. Changes to your home’s wiring, such as a new main panel, need a separate electrical permit: $196, plus $100 for its inspection.
- Review time
- The city aims to pre-screen a solar permit the same day and finish its first review within 3 days. Since September 2025, a licensed third party can review and inspect instead, and the city must then issue the permit within 3 business days.
- Historic districts
- In a landmark district such as Swiss Avenue, Munger Place or Winnetka Heights, you need a Certificate of Appropriateness first. The city lists solar panels as routine work its preservation staff can approve, though not every project qualifies. A routine certificate takes up to 21 days, most 7 to 10 business days.
- Connects it
- Oncor. It reviews the application, signs an interconnection agreement with you and sends a permission-to-operate letter, then programs your meter to measure the power you send back.
- Exports
- Credited by the retail electricity plan you choose, not by Oncor.
If you have an HOA
Texas law bars HOAs from banning or restricting rooftop solar. Yours can still require its approval before work starts, keep panels within the roofline and parallel to the roof, ask for silver, bronze or black frames and wiring, and designate where on the roof they go, unless your spot would make more than 10% more power a year. If the plan meets its rules, it can refuse only in writing and on narrow nuisance grounds. We file the request.
Permits from the City of Dallas’s solar application checklist (May 2024) and Service First Bulletins 200 and 204 (2022, 2025); historic districts from its Office of Historic Preservation; the hookup from Oncor’s solar interconnection page; HOAs from Texas Property Code §202.010. Checked 19 November 2026. Fees change: the city’s current schedule decides.
What does solar cost in Dallas?
Find your monthly kWh on your electricity bill and read across: that’s the system a Dallas roof needs to cover 90 to 100% of your use, and its price before incentives. At the Texas average of 1,096 kWh a month, that’s about 8.3 kW, roughly $17,300 to $19,000.
Incentives: Texas has no income tax, so there’s no state solar credit, and the 30% federal credit for homeowners ended with 2025. The value solar adds to your Dallas home is exempt from property tax: file Form 50-123 with your county appraisal district.
All Texas incentivesBy monthly use
1,096 kWhTexas average
System8.3 kW
Panels19
Before incentives$17,300 to $19,000
1,500 kWh
System11.4 kW
Panels26
Before incentives$23,700 to $26,000
2,000 kWh
System15.2 kW
Panels35
Before incentives$31,600 to $34,600
2,500 kWh
System19.0 kW
Panels44
Before incentives$39,500 to $43,300
Work it out for your own bill
Add up the kWh on your last 12 bills, or multiply one month by 12.
- System in Dallas
- 8.3 kW19 panels
- At one IntegrateSun project’s price ($2.08/W)
- $17,300
- At Dallas’s average ($2.28/W)
- $19,000
- Before any incentives
- $17,300 to $19,000
Sizing: Dallas’s 5.41 peak sun hours a day (PVWatts) and 440-watt panels, to cover 90 to 100% of a year’s use. Prices before incentives: one IntegrateSun project (16.72 kW, cash price) and EnergySage’s Dallas average as of November 2026. Texas average use: U.S. Energy Information Administration, 2024. An estimate, not a quote: your roof and equipment set the real price.
Who pays for the solar you send back in Dallas?
Not Oncor. Oncor owns the lines across Dallas and connects your system, but Texas law has you sell the surplus to the retail provider you buy power from, on terms the two of you agree. Dallas homes choose their provider, so the plan sets what your extra solar earns. Check its Electricity Facts Label for the buyback terms.
Send us your plan’s facts label and we’ll design your system around its buyback terms.
Compare plans on Power to Choose (the state’s site, opens in a new tab)After switch-on: Oncor programs your meter to measure what you send back and passes the readings to your provider within 30 to 60 days of permission to operate.
Ask any Dallas provider before you sign
- Credit per kWh
- Does each kWh you send back earn your full price per kWh, or a lower set rate?
- Cap
- Is every kWh credited, or only up to what you use that month?
- Carryover
- Do leftover credits roll over to next month, or are they paid out or lost?
- Fees and contract
- What are the monthly fee, the contract length and the fee for leaving early?
- Switching
- What happens to unused credits if you change plans? Some plans forfeit them.
How the plan shapes your system
A plan that credits close to your full rate
Power you send back is worth nearly as much as power you use, so covering your whole year’s use with panels makes sense.
A plan that credits much less
Solar is worth most when it’s used as it’s made, so a battery that stores the midday surplus for the evening adds more.
Texas Utilities Code §39.916 (selling surplus to your retail provider; connecting through Oncor). Credits set out in the Electricity Facts Label, and unused credits forfeited on leaving: a large Texas provider’s own solar plan page. Checked November 2026. No provider is named: plans and rates change monthly.
How much do solar panels cost in Dallas?
About $17,300 to $19,000 before incentives for a home using 1,096 kWh a month, the Texas average, which takes about 8.3 kW of panels under Dallas sun. At 2,000 kWh a month, plan on about 15.2 kW: $31,600 to $34,600. EnergySage puts the Dallas average at $2.28 a watt as of November 2026; your roof and equipment set the real price.
Prices by monthly useDo I need a permit for solar panels in Dallas?
Yes. The City of Dallas Planning and Development Department issues it through DallasNow, after a zoning, building code and fire review of plans a licensed engineer has reviewed or sealed. The fees are $15 at submittal, $577 for plan review and $125 for the building inspection. We file it for you.
How a Dallas install runsHow long does it take to go solar in Dallas?
About two months from signing. The city aims to finish its first review of a solar permit within 3 days, and with Oncor’s application the paperwork takes about 4 to 6 weeks in all. Our crew installs in 1 to 2 days, then inspection and Oncor’s permission to operate take about 2 to 3 weeks.
Can solar panels handle Dallas hail?
Most hail, yes, but the biggest stones can crack them. To be hail certified, a panel only has to come through 11 strikes from 1-inch ice balls at 51 mph with less than 5% power loss, and the U.S. Department of Energy says that basic test isn’t enough where hail is severe. Oncor reported large hail across its service area in 2024 and 2025, so ask which hail test your panels passed and how your home insurance covers them.
Will solar panels keep my power on in a Dallas outage?
Not on their own: grid-tied panels shut off when the grid does. With a battery, the circuits you pick stay on and the panels recharge it on sunny days; one Powerwall 3 runs a fridge, lights, Wi-Fi, chargers and a few outlets for about 27 hours. Dallas has needed it: the May 2024 storm cut power to more than 650,000 Oncor customers, and 50,000 were still out 3 days later.
Oncor’s outage recordDo I have to change my electricity plan to go solar in Dallas?
No. Oncor connects your system whichever provider you use, and it says you don’t have to join a buyback program. But your plan decides what the solar you send back earns, so check its buyback terms before your system switches on: Oncor passes your export readings to your provider within 30 to 60 days of permission to operate.
What to compareCan I put solar panels on a house in a Dallas historic district?
Yes, with a Certificate of Appropriateness first. In landmark districts such as Swiss Avenue, Munger Place and Winnetka Heights, the city lists solar panels among the routine work its preservation staff can review, within 21 days and most in 7 to 10 business days. Each district’s ordinance sets its own design rules.
Does IntegrateSun have an installation team in Dallas?
Yes. Our installation team is based in Dallas and works across Texas. Our headquarters is at 7055 Old Katy Rd, Suite 505, Houston, TX 77024, and we handle the permit, your HOA’s approval and the Oncor application ourselves.

Ready to make your own power?
Get a free quote built around your roof and your last year of bills, or call and talk it through with our team.
